Mobile Diesel Engine Hamer Mill Used for Gold Stone

Product Details
Customization: Available
Type: Hammer Crusher
Motor Type: AC Motor
Still deciding? Get samples of $ !
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (15)
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
  • Mobile Diesel Engine Hamer Mill Used for Gold Stone
Find Similar Products

Basic Info.

Model NO.
LZ240/500
Motor Power
7.5kw
Application
Mine
Materials
Gangue
Outlet Size
18-48mm
Inlet Size
250×400mm
Condition
New
Warranty
1 Year
After-sales Service
Online Engineer
Capacity(T/H)
1-2
Input Size(mm)
50
Output Size(mm)
1.8
Hammer of Piece
6
Diesel(Horse)
24
Transport Package
Export Packing
Specification
LZ240/500
Trademark
oasis
Origin
China
Production Capacity
1000/Month

Product Description

    Hammer Crusher
    
Hammer crusher can crush ore which is below 50mm or the tailings, middlings which in the uncompleted ore. And break up the useful metal from the ore, depending on the requirement of factory, it can crush the mineral particles in 1 to 180 mesh,They are suitable for the small factory, and same times can take place of ball mill in some degree, Easy installation, easy operation, less investment, fast effect
Model Capacity(t/h) Input size(mm) Output size(mm) Hammer of piece(number) Motor(kw) Diesel(Horse)
LZPC240/500 1-2 ≤50 ≤1.8 6 7.5-15 24
LZPC300/500 1.5-3 ≤50 ≤1.8 8 11-18.5 30
LZPC400/500 3-6 ≤50 ≤1.8 10 15-22 45
LZPC400/600 4-8 ≤50 ≤1.8 10 18.5-30 45
LZPC500/600 5-12 ≤50 ≤1.8 12 22-30 60
Mobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneMobile Diesel Engine Hamer Mill Used for Gold StoneOur Service                                                                                                                      

1.Starting by running the mineral beneficiation experiment. To provide our clients with the best solution accordingly;

2.Besides supply the flowchart design & equipment, we also provide the infrastructure design; Electrical & pipeline system design, etc. To help our clients complete the design of the whole plant;

3.After the installation, debugging of the equipment, the official production will also be guiding by our experienced engineers on site, to guarantee the output minerals perfectly meet your demands.

FAQ:

1.Q: What Information needed to get accurate quotation and proposal?
A:1). What type is the mining? Is it rock stone? or it is sand?
  2). If rock stone, what is the general particle size(mm) of the raw ore?
  3). What is the handling capacity (tons per hour) you need?
  4) .What is the elements of the raw ore? How much percent % of each minerals?

2. Q: Can we send the mineral samples to you to run the ore-dressing experiments test?
A:Yes, we can run the ore-dressing experiments for our customers. After the test, we will give you the reasonable flowchart, suitable solution and equipments selection. etc. based on the test results.

3.Q: What about warranty of the equipments? Any spare parts supplied?
A:The warranty period of OASIS equipments is 12 months. And of course we will supply the spare parts to you for life-long time at lowest cost.

4.Q: The reason you choose OASIS?
A:1). Professional manufacturer of supplying mining equipment, Ore beneficiation equipment and mining dryers.?
  2). Experienced and professional R&D team and manufacturing team.
  3). Professional sales team consisted of dedicated, dynamic and innovative staff with international version.
  4). Professional logistics service ensuring safety and timely delivery of products all over the world.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier